Thermal Power Plant Reconstruction

The power plant is running on natural gas with diesel as a backup fuel. The project was aiming to reconstruct the boiler house with an obsolete steam boiler and replace it with a fire tube steam boiler. The new boiler should have capacity of at least 20 t/h steam and an operating pressure of up to 1.3 MPa.

Apart of the equipment retrofit, the necessary measures were taken to provide the compliance of the building with the norms of thermal power plants, domestic premises were redesigned and repair works were undertaken according to the survey report.
Related Markets
Energy

Related Services
> Process Engineering & Piping
> Piping Modeling
> Structural Design
> Mechanical & HVAC
> BIM Modeling
> BIM Coordination
Services

• Main Equipment selection
• Piping design
• HVAC Systems design
• Structural Design
• Construction Supervision

BIM Implementation

Revit models were created for:
• Architecture and structure of the existing building
• New steel raised walkway service platform
• New HVAC Systems
• Boilers and pipes, which meet new design requirements
Interdisciplinary model in Navisworks Manage has insured clashes detection and efficient communication both among team members and with the client.