Production and Technical Center with
Data Processing & Storage Equipment

This is the Data Processing Centre with the capacity of up to 8 server racks and electrical capacity of 8MW. The total area is 35,000 m2. The centre was designed for the safety level TIER 3.
It is developed in accordance with the requirements ANSI/TIA-942-2, ANSI/EIA/TIA-568-B, ANSI/EIA/TIA-569-B, ANSI/EIA/TIA-570.
The Data Center is implemented under the principle "building in a building" to exclude the impact of possible natural disasters.

Design requirements
• Land Plot: 3.8 ha, 51% to be built-up
• Buildings: Main (Equipment & Office Block), 2 Check-Points, Boiler House, Fire Pumps
• 4 Modules in Main Building
• 200 Server Racks per Module
• Staff: 200 People
• Power Consumption: 2.5 MW
• Construction Time: 18 Month
Key features:
Server racks — 8 ps.
Electrical capacity — 8MW
Total area — 35,000 m2


Related Markets
>Industry

Related Services
> Architecture
> Structural Design
> Mechanical & HVAC
> Electrical Engineering
> Automation & Control
> BIM Modeling

Services for Data Center Design

• Master Plan
• Architectural Concept
• Detailed Design of Building Structures
• Design of Independent Back-up Power Supply
• Heating, Ventilation and Air Conditioning
• Fire Extinguishing System
• Safety Systems
• Construction Supervision