Production and Technical Center with Data Processing & Storage Equipment
This is the Data Processing Centre with the capacity of up to 8 server racks and electrical capacity of 8MW. The total area is 35,000 m2. The centre was designed for the safety level TIER 3. It is developed in accordance with the requirements ANSI/TIA-942-2, ANSI/EIA/TIA-568-B, ANSI/EIA/TIA-569-B, ANSI/EIA/TIA-570. The Data Center is implemented under the principle "building in a building" to exclude the impact of possible natural disasters.
Design requirements • Land Plot: 3.8 ha, 51% to be built-up • Buildings: Main (Equipment & Office Block), 2 Check-Points, Boiler House, Fire Pumps • 4 Modules in Main Building • 200 Server Racks per Module • Staff: 200 People • Power Consumption: 2.5 MW • Construction Time: 18 Month
Key features: Server racks — 8 ps. Electrical capacity — 8MW Total area — 35,000 m2